Clear-span galvanized steel structures engineered off-site and bolted together on yours — warehouses, factories and commercial builds delivered in months, not years.

Clear-span pre-engineered galvanized steel building frame
  • up to 90mclear span
  • 50+ yrdesign life
  • IS 800compliant

Explore Pre-Engineered Buildings

Overview

Built around the process

Bay spacing, crane gantries and service routes are set by your production line, not by a catalogue. Frames are analysed for crane surge and equipment loads before fabrication, so the shell never limits how the plant is laid out.

Manufacturing facility built by PrimeNMS

Crane ready

Gantries designed into the frame.

Service routes

Ducting and cable trays planned in.

Live-site erection

Phased around running production.

Specifications

Every plant is designed to order — spans, crane capacity and bay spacing specified to your process.

CLEAR SPAN

up to 60m

Column-free production floor

CRANE CAPACITY

up to 40T

EOT gantries built into the frame

EAVE HEIGHT

6–18m

Set by equipment clearance

FLOOR LOADING

to spec

Plinths designed with your civil team

FAQ

  • Design and approval typically runs three to four weeks, fabrication four to eight weeks depending on tonnage, and erection begins as soon as the foundation is ready. Most projects are weather-tight within four months of order.

Ready when you are

Send us your span, bay spacing and site location — we'll engineer and quote the right frame.

Completed PrimeNMS pre-engineered steel building